The new system, designed to consolidate all sulphur storage, uses a 140 metre long elevated stacker conveyor to create a single 25 metre high, 160,000 tonne stockpile. The capital value of the project was $50 million and included a new dumper capable of both the rotary dumping of sulphur unit trains and the bottom dumping of fertilizer cars, seven new conveyors, and a 200 tonne surge bin, plus the reconstruction of existing underground sulphur reclaim system.